Highway Products

by Parex

One of the UK s broadest portfolios of mortars, grouts and fixing materials for a host of highway applications including bedding manholes, frames and ironwork, fixing street furniture, patching and laying kerbs, etc.
Highway CA1, CA45, C1, C2, QSM and Universal conform to DTp HD27/94, the Highways Agency Design Manual for Roads and Bridges, Volume 7, Section 2, clause 3.11. Mortars for bedding ironwork, such as manhole cover frames during repairs, may be trafficked when the strength is expected to be 20N/mm . For rapid construction, this strength should be achieved within 2 hours. Highway C3 will achieve the required 20N/mm in 3 hours.
The Highway range of products have been designed for the bedding of manhole frames and road furniture with specific timing for road opening:
CA45 and QSM - Road opening within 45 minutes

CA1 and C1 - Road opening within 1 hour

C2 Road opening within 2 hours

C3 Road opening within 3 hours

Specification Details for Highway Products (Miscellaneous)

Please note that these product properties are not a replacement for the manufacturer's literature and it is always recommended that Parex is consulted before specifying.

Parex hasn't formatted technical specifications for Highway Products yet.

Please check out the similar products section for alternatives. Hint: products with have technical specifications.