Our Climbaround that is designed to be installed in three phases so that you can spread the cost over time. Alternatively, you can buy all three phases together.
Our Climbaround that is designed to be installed in three phases so that you can spread the cost over time. Alternatively, you can buy all three phases together.
Aldwickbury Phase 1 BX/HMP 150001
Aldwickbury Phase 2 BX/HMP 150002
Aldwickbury Phase 3 BX/HMP 150003
Aldwickbury All Phases BX/HMP 150026
Please note that these product properties are not a replacement for the manufacturer's literature and it is always recommended that Hand Made Places is consulted before specifying.
|
|
||
| Typical Building Sector (?) | Education | |