Simply poured into the excavation to the required level, BREEDON Foam™ requires no compaction and restores lateral support to any adjacent services. The surface is struck off and the backfill is then complete. A wearing course can generally be laid within 24 hours.
BREEDON Foam™
Key benefits
Please note that these product properties are not a replacement for the manufacturer's literature and it is always recommended that Breedon is consulted before specifying.
|
|
||
| Uniclass (?) | Pr_20_31_16 Concretes | |