Toproc Rapid - Early strength concrete

by Tarmac

Toproc Rapid delivers a range of concretes that provide both rapid setting and high early strength properties resulting in increased turnaround and productivity. Toproc Rapid is as easy to place as conventional concrete and develops the high strength that traditional mixes would achieve in 28 days in just hours. Also, unlike other concretes that require up to 3 to 7 days before formwork can be removed, Toproc Rapid becomes effective in as little as 15 hours allowing construction to continue more quickly.


A range of ready-formulated Toproc Rapid products are available to meet all different types of strength requirements, within time frames ranging from 15 hours to 48 hours.

Specification Details for Toproc Rapid - Early strength concrete (Cement)

Please note that these product properties are not a replacement for the manufacturer's literature and it is always recommended that Tarmac is consulted before specifying.

Looking for specific information on the sustainability credentials of this product?

File Downloads for Toproc Rapid - Early strength concrete

Clear selection

One-Click Quote