Why you should choose a Tricel Novo UK 6 Wastewater Treatment Plant

27-07-2022

Tricel Novo UK6

The Novo UK 6 is an innovative sewage treatment plant using a fixed culture process.

This technology is known for its exceptional purifying performance and response to load variations. Using a bacterial bed and a sludge recirculation system, the Novo 6 is capable of treating both:

  • Overloaded capacity when guests visit your house
  • Underuse of the unit due to fewer users or a lack of usage. 

These two events can occur safely without deteriorating bacteria or affecting quality. Bacteria in the Tricel Novo UK are living organisms that adjust to fluctuations.

A high capacity load will multiply bacteria to consume the extra volume. Furthermore, bacteria reduce mass in times of low activity to match consumption requirements.


There are many key reasons to choose a Tricel Novo wastewater treatment plant:

1. Highly durable SMC tank 

Tricel Novo tanks are made from compression-moulded SMC. Components are manufactured under heat and high pressure and have unrivalled strength and durability over standard GRP or polyethylene tanks.

2. Ceramic diffuser

With a ceramic diffuser, Tricel's domestic wastewater treatment plants last twice as long as their competitors' rubber counterparts. As a result, you save both on call-out fees and replacement parts.

3. Environmental agency compliance

Ensures compliance with the Environment Agency's General Binding Rules in England, Natural Resources Wales' exemption criteria, and Scottish Environmental Protection Agency requirements. Consult your local agency about the appropriate level of effluent treatment.

4. Minimum maintenance and repair costs

The plant has no moving parts or pumps, ensuring reliable operation. Repair and maintenance costs are minimal.

5. Lower installation costs

Most sites do not require concrete backfill for installation, saving up to £300.

6. Fitted alarm

All Tricel Novo systems come with a factory alarm.

7. Fully tested and certified

Tricel wastewater treatment plants have all been tested to European standards EN 12566-3. All plants are tested for strength, water tightness, durability, and treatment efficiency during this certification process.

The CE certification of a wastewater treatment plant ensures that it has passed the tests and inspections, providing higher efficiency and security.


Tricel Novo UK 6 Specifications

  • Dimensions: Length 2.1m x Width 1.64m x Height 2.24m
  • Weight while empty: 270kg
  • Inlet invert to the base: 1.375m
  • Outlet invert to the base: 1.3m
  • Inlet invert to ground level: 0.535m

There is plenty of key reason to choose a Tricel Novo UK6. If you require more information about the Tricel Novo UK6, don't hesitate to download our brochure for homeowners or manual for installers.

You can also contact Tricel or view the full range of sewage treatment plants.


Related Products

Height: 1990, 2240, 227...
Weight: 270, 300, 370, ...
Width: 1640
Length: 2100, 2600, 310...
Warranty: 20
CE Marking: 1
Standards: EN12566-3
Features: Compression mou...