TSL were developing a significant distribution site at Magna Park South in Lutterworth. With the site based in the latest expansion of the Magna Park logistics hub in the “golden triangle” of UK logistics connectivity. Magna Park is one of the largest Warehouse Parks in Europe.
To be compliant with strict regulations for Oil and Hydrocarbon separation on discharge. A requirement from Marsh Industries for 5 Full Retention Separators was identified. Alongside an additional 2 Bypass Separators and a Forecourt Separator to protect against major fuel spillages.
| Uniclass: | Pr_65_55 Liquid... |
| Area: | 340 |
| Length: | 3040 |
| Diameter: | 1250 |
| CE Marking: | 1 |
| Standards: | EN 858 |
| Guarantee: | 25 |
| Connection Diameter: | 200 |