Extra Heavy Duty Load L5

by IG Lintels

To achieve loading figures lintel must be built in with blockwork as shown. Ensure all perpendicular and horizontal joints are filled with mortar. Place mortar bed on top of blockwork before floor units are laid to provide even distribution of load. Steel Lintels may be propped to facilitate speed of construction.

Specification Details for Extra Heavy Duty Load L5 (Lintels)

Please note that these product properties are not a replacement for the manufacturer's literature and it is always recommended that IG Lintels is consulted before specifying.

Looking for specific information on the sustainability credentials of this product?

File Downloads for Extra Heavy Duty Load L5

Clear selection

One-Click Quote