The Governors of Stamford Endowed Schools announced in May 2022 that the schools would become fully co-educational at all stages. The move to co-educational learning began in September 2023, with operational transition planning well underway across the schools in preparation for the next academic year. As part of this transition co-educational washrooms were installed in the school in readiness. Cubicle Centre panels have been specified throughout in both a large gender neutral washroom with full height privacy toilet cubicles and in a new state of the art sports facility with colour coordinated themed changing rooms.
Co Educational Washrooms
The first of several proposed gender neutral washrooms was installed in the main school building, with mixed sex full-height Privacy Cubicles. Dedicated female-only toilet cubicles are set aside on one side of the washrooms for that added aspect of privacy. A communal handwash area was finished off with Corian wash troughs for the added stylish and sanitary detail.
See the full Case study here:
https://www.washroomcubicles.co.uk/case-studies/stamford-schools/
| Height: | 1955 |
| Thickness: | 13 |
| Material: | Compact Grade L... |
| Floor clearance: | 155 |
| Door Width: | 600 |
| Application: | High Traffic Ar... |
| Typical Building Typ...: | Hospitals, Leis... |
| Typical Building Sec...: | Education, Heal... |